Industries: Water utilities
For the utility that supplies a city.
Water boards and municipal corporations run networks they mostly cannot see. Ilonnati puts reservoirs, mains, valves and connections on one screen, and the valves under remote control.
- Use cases
- 4 described below
- To start
- A pilot at one site
On a typical site
- Elevated reservoir
- Pump set
- Motorised valve
- Meter at each connection
- Ilonnati controller
In short
An urban utility draws, treats, stores and distributes water through service reservoirs, overhead tanks and zones of mains, branch and distribution lines, out to colonies, high-rises, row houses, malls, IT parks and industry. Much of it is run by hand and known after the fact. Ilonnati fits controllers to the valves, pumps and reservoirs already there, meters at zone inlets and connections, and quality probes at the works and in distribution. IoTyX shows it all on a map of the network, with alerts, remote control and reports by zone, so supply can be shared evenly, losses traced and bursts isolated from the control room.
Why it is hard
The challenges
What makes water utilities hard to run without live measurement.
What Ilonnati runs hereWater that cannot be accounted for
Unaccounted-for and non-revenue water is known as a total, if at all, with no way to say which zone is losing it.
Unequal supply
Zones near the reservoir get more than they need, while tail-end areas and supply pockets get too little, and complaints are the only measure.
Valves turned by hand
Every change to supply, and every isolation after a burst, waits for a crew to reach each valve.
Ageing mains
Old mains leak and burst more often, and without pressure readings a failing main is found only when it gives way.
No measured basis
Distribution is planned without measured quantity and quality, so schedules and investment rest on estimates.
What Ilonnati measures and runs
Ilonnati controllers and sensors on the equipment, IoTyX on the screen.
Zone inflow and consumption
Bulk meters at each zone inlet and meters at the connections, so water in and water used are compared zone by zone.
Pressure
Transmitters on mains, zone boundaries and tail ends show where supply is short and where a main may have burst.
Reservoir and tank level
Radar sensors in service reservoirs and overhead tanks, with alerts before an overflow or a dry tank.
Water quality
pH, turbidity, residual chlorine, TDS and nitrate, from the treatment works to the far end of the network.
Valve position
Each motorised valve’s position from 0 to 100% open, reported as it moves and confirmed when it arrives.
Pumping stations
Pump state, running hours and energy use at each pumping station.
Use cases
Each has a page of its own: the situation, how it works and what is measured.
Urban water networksReservoirs, zones, valves and meters across a city network, measured and run from one control room.MeasuresZone inflow, Consumption at connections, Main and tail-end pressure
Leak and theft detectionBursts, leaks, illegal draws and meter tampering found from flow and pressure, not from complaints.MeasuresZone inflow, Consumption at connections, Main pressure
Pump and reservoir automationPumps that run on the tank’s level, and valves that deliver a set quantity at a set time, held at the controller.MeasuresTank and reservoir level, Sump level, Flow and running total
Water quality monitoringpH, turbidity, residual chlorine, TDS and nitrate measured continuously, from the treatment works to the far end.MeasurespH, Turbidity, Residual chlorine
The rules and programmes behind it
Public programmes and rules that ask for this kind of measurement. Each links to the body that publishes it.
< 20%
AMRUT 2.0 sets a reform target of non-revenue water below 20% for every urban local body.
AMRUT 2.0, Cabinet approval, 12 October 2021135 L
The national benchmark for urban water supply is 24-hour supply, 100% metered connections, 135 litres per person per day and non-revenue water of 20%.
Service Level Benchmarks, CAG research paperPey Jal Survekshan gives the most marks for flow measurement to a complete SCADA set-up running from the source to the consumer’s meter.
Pey Jal Survekshan Toolkit, MoHUA50%
To earn the incentive for reducing non-revenue water, a city meters every source and bulk distribution point and sets up District Metered Areas covering half its population.
AMRUT 2.0 Reforms Toolkit, MoHUA
Questions buyers ask
Ask about your own network, plant or campus. An engineer will reply.
Contact us01Where does a utility usually start?
With a pilot on part of the network: a few zones, their reservoirs and the valves that feed them. It is extended once the pilot has done what it was meant to.
02Has Ilonnati worked with a city utility?
Yes. Ilonnati fitted remote valve control to existing valves in an urban distribution network in Telangana, so operators open, close and schedule them from the control room.
03Can the network be shown on a GIS map?
Yes. Pipes, valves, reservoirs and supply zones are placed on a GIS map of the network, each with its live reading.
04Where is the data kept?
In India. For government projects IoTyX can also run on dedicated or on-premise servers.
Related industries
The same hardware and the same platform, set up for other sites in water and utilities and beyond.
Water and utilitiesRural waterVillage and multi-village schemes, from the borewell and overhead tank to the tail-end household.
Water and utilitiesTransportRailway stations and bus stands: drinking-water quality measured at the tap and shown to passengers.
Campuses and buildingsHousing communitiesGated communities, apartment societies and row houses: tanks that refill themselves, metered homes and leak alerts.
Campuses and buildingsCommercial buildings and campusesOffices, malls, SEZs, IT parks and large campuses: water, energy and daily operations measured on one platform.
